{"id":677,"date":"2018-03-09T10:47:36","date_gmt":"2018-03-09T14:47:36","guid":{"rendered":"https:\/\/f2labs.com\/technotes\/?p=677"},"modified":"2023-09-01T08:00:52","modified_gmt":"2023-09-01T12:00:52","slug":"partly-completed-machinery-and-the-requirement-for-assembly-instructions","status":"publish","type":"post","link":"https:\/\/f2labs.com\/technotes\/2018\/03\/09\/partly-completed-machinery-and-the-requirement-for-assembly-instructions\/","title":{"rendered":"Partly completed machinery and the requirement for Assembly Instructions"},"content":{"rendered":"<p>Manufacturers who build parts of machines or incomplete machinery (for example: no controls) must be aware that their equipment must not carry a CE marking if the equipment is not in scope of any other Directive(s) and must follow a separate compliance path in the <a href=\"https:\/\/f2labs.com\/machinery-directive-testing\" target=\"_blank\" rel=\"noopener noreferrer\">Machinery Directive 2006\/42\/EC.<\/a><\/p>\n<p>This is an important distinction because, in my opinion, it is more complicated (more documentation) to send a partly completed machine versus a fully functioning &#8220;machine&#8221; to the EU as pertains the MD 2006\/42\/EC compliance process.<\/p>\n<p>For completed machinery, unless your equipment is under Annex IV, the process is very straightforward. See Article 12 &#8211;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-678\" src=\"https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/article12.jpg\" alt=\"\" width=\"487\" height=\"377\" srcset=\"https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/article12.jpg 487w, https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/article12-300x232.jpg 300w\" sizes=\"auto, (max-width: 487px) 100vw, 487px\" \/><\/p>\n<p>This is the usual &#8216;<a href=\"https:\/\/f2labs.com\/ce-compliance-testing-accreditation-approval\" target=\"_blank\" rel=\"noopener noreferrer\">self-certification<\/a>&#8216; process: the manufacturer evaluates the equipment to Annex I usually with the aid of a competent 3rd party testing lab, uses applicable harmonized EN standards to evaluate and test, incorporates technical solutions, puts a CE marking on the equipment and&#8230; &#8220;off you go.&#8221;<\/p>\n<p><a href=\"https:\/\/f2labs.com\/request-quote\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-1171 size-full\" src=\"https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2020\/04\/button_request-a-quote-1.png\" alt=\"\" width=\"210\" height=\"42\" \/><\/a><\/p>\n<p>For partly completed machinery the process is more complicated. See Article 13 &#8211;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-679\" src=\"https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/article13.jpg\" alt=\"\" width=\"476\" height=\"484\" srcset=\"https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/article13.jpg 476w, https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/article13-295x300.jpg 295w\" sizes=\"auto, (max-width: 476px) 100vw, 476px\" \/><\/p>\n<p>This article will not detail every nuance of sending partly completed machinery to the EU but I want to stress four points:<\/p>\n<ol>\n<li>A CE marking is not allowed on the equipment until the integrator finishes the machine and makes it fully compliant, unless it is in scope of another CE marking Directive. In that case there must be a CE marking to show compliance to the other Directive(s).<\/li>\n<li>A declaration of incorporation instead of a declaration of conformity must be prepared in cases where only the Machinery Directive applies. The most notable difference besides the title is that on a DoI the manufacturer must list every individual Annex I EHSR that is complied with. That is not done on a DoC.<\/li>\n<li>A second declaration will be required &#8211; this one a declaration of conformity &#8211; to address the Directive(s) the equipment complies with.<\/li>\n<li>Assembly instructions must be prepared. That is kind of an innocuous term for what they really want because what they mean by &#8220;assembly instructions&#8221; includes any Annex I EHSR&#8217;s that are identified as applicable but not complied with because the equipment is not complete. In other words: the manufacturer must say to the integrator, &#8220;hey, we see this risk here and you have to address it when you complete the build.&#8221;<\/li>\n<\/ol>\n<p>See the Guide to Application of the Machinery Directive 2006\/42\/EC, Edition 2.1, Section 390, para 3:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-681\" src=\"https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/assembly-instructions.jpg\" alt=\"\" width=\"700\" height=\"94\" srcset=\"https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/assembly-instructions.jpg 816w, https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/assembly-instructions-300x40.jpg 300w, https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/assembly-instructions-768x104.jpg 768w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/p>\n<p>Are you bidding on or building a machine or partly completed machinery for the EU?<\/p>\n<p>Want some help? F2 Labs helps manufacturers across the globe every day with these issues. We have experts who quickly determine what is applicable to the equipment, legally and technically.<\/p>\n<p><a href=\"http:\/\/www.f2labs.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">F2 Labs<\/a>\u00a0is here to help.<\/p>\n<p>We can be contacted via this\u00a0<a href=\"http:\/\/f2labs.com\/contactx\">link<\/a>.\u00a0We can be reached by phone at 877-405-1580 and are here to help you.<\/p>\n\n\n<script type=\"application\/ld+json\">\n{\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"BlogPosting\",\n    \"mainEntityOfPage\": {\n        \"@type\": \"WebPage\",\n        \"@id\": \"https:\/\/f2labs.com\/technotes\/2018\/03\/09\/partly-completed-machinery-and-the-requirement-for-assembly-instructions\/\",\n        \"url\": \"https:\/\/f2labs.com\/technotes\/2018\/03\/09\/partly-completed-machinery-and-the-requirement-for-assembly-instructions\/\",\n        \"description\": \"Simplify your declaration of conformity for partly completed machinery directive. Ensure compliance & smooth approval process. Learn more here!\"\n    },\n    \"headline\": \"Partly completed machinery and the requirement for Assembly Instructions\",\n    \"image\": [\n        \"https:\/\/f2labs.com\/technotes\/wp-content\/uploads\/2018\/03\/article12.jpg\"\n    ],\n    \"keywords\": [\n        \"Partly Completed Machinery Directive\"\n    ],\n    \"datePublished\": \"2018-03-09\",\n    \"dateModified\": \"2021-02-11\",\n    \"author\": {\n        \"@type\": \"Person\",\n        \"name\": \"Peter Jolles\"\n    },\n    \"publisher\": {\n        \"@type\": \"Organization\",\n        \"name\": \"F2 Labs\",\n        \"foundingDate\": \"1998\",\n        \"logo\": {\n            \"@type\": \"ImageObject\",\n            \"url\": \"https:\/\/f2labs.com\/wp-content\/uploads\/2022\/01\/cropped-F2-Logo-400w-e1620677350504-2.png\"\n        }\n    }\n}\n<\/script>\n","protected":false},"excerpt":{"rendered":"<p>Manufacturers who build parts of machines or incomplete machinery (for example: no controls) must be aware that their equipment must not carry a CE marking if the equipment is not in scope of any other Directive(s) and must follow a &hellip; <a href=\"https:\/\/f2labs.com\/technotes\/2018\/03\/09\/partly-completed-machinery-and-the-requirement-for-assembly-instructions\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,215,3,79],"tags":[9,141,10,235,237,238,100,234,17,236],"class_list":["post-677","post","type-post","status-publish","format-standard","hentry","category-ce-marking","category-consulting","category-machinery-directive-200642ec","category-product-testing","tag-ce","tag-ce-mark","tag-ce-marking","tag-ce-marking-directives","tag-declaration-of-incorporation","tag-declaration-of-incorporation-for-partly-completed-machinery","tag-ec-declaration-of-conformity","tag-eu-directives","tag-md-200642ec","tag-partly-completed-machinery"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/f2labs.com\/technotes\/wp-json\/wp\/v2\/posts\/677","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/f2labs.com\/technotes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/f2labs.com\/technotes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/f2labs.com\/technotes\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/f2labs.com\/technotes\/wp-json\/wp\/v2\/comments?post=677"}],"version-history":[{"count":11,"href":"https:\/\/f2labs.com\/technotes\/wp-json\/wp\/v2\/posts\/677\/revisions"}],"predecessor-version":[{"id":1621,"href":"https:\/\/f2labs.com\/technotes\/wp-json\/wp\/v2\/posts\/677\/revisions\/1621"}],"wp:attachment":[{"href":"https:\/\/f2labs.com\/technotes\/wp-json\/wp\/v2\/media?parent=677"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/f2labs.com\/technotes\/wp-json\/wp\/v2\/categories?post=677"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/f2labs.com\/technotes\/wp-json\/wp\/v2\/tags?post=677"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}